Projects

2008 - Steel - Combustion Controls Upgrade.

2008 - Petrochemical - American Samoa - Load Rack Control System.

2008 - Chemical - pH Control System Installation.

2007 - Gas Detection - Multiple Landfill Sites - Upgrades

2007 - Steel - Dump Tank Level Controls.

2007 - Chemical - Batch Weighing System.

2007 - Chemical - Waste Water Treatment Tank Controls.

2007 - Chemical - replacement of Foxboro Control System with DeltaV Control System and Stahl Remote I/O Panels.

2004 - Chemical - DeltaV & Stahl Remote I/O - chemical plant control system upgrade utilising Stahl remote i/o panels in Zone 1 Area.

2004 - Steel - Tundish Dryer - replacement control system incorporating ramping, soaking, and multiple burners.

2004 - Power  - New Generator - commissioning.

 
Login/Register
UserName:
Password:
To register on this site go here>>
To find your password go here>>